Rob,
If you use full table lenght pieces of 3x1 then do you just deposit on these railings say 3/4" sheet of mdf (with HDF bonded on top) or is it better to take the time to build a thick more rigid table (like the foam cored thin mdf) ?
Sorry for my reply, I was under the impression that you always use a vac bag between the workpiece and the table also. Then do I need to put some mold release on the table ?
I have been looking for KSS workshop for some time now ... nothing.
Gardner,
Not sure where you are on the east cost ? If not too far, I could lend you a pair of hands for a weekend if you are interested ?